Presupuesto

De:

Calle Berna, 3 1ªA
28232 Las Rozas
MADRID

sagarbe@sagarbe.com

número de Presupuesto5075/19
fecha de Presupuesto25 septiembre, 2019
Total€74.028,55
Para:
ANF

At.: Ryan Mobley

Replacemant of RTU's Centro - Oberhausen - OPTION C - HEAT THERMODYNAMIC RECOVERY

CantidadServicioTarifa/PrecioSubtotal
1LABOR
€0,00€0,00
8 hs.Preparation and extracting refrigant removal exciting RTU's
€95,00€760,00
4 hs.Dismantel and preparation electrical power supply RTU's
€95,00€380,00
8 hs.Dismanteling of excisiting ductwork
€95,00€760,00
8 hs.Disconneting RTU's from installations
€95,00€760,00
8 hs.Disconneting RTU's from installations
€95,00€760,00
6 hs.Adjustments steelconstruction footprint
€95,00€570,00
8 hs.Placing and adjusting of new RTU's
€95,00€760,00
16hs.Placing and mounting of new ductwork
€95,00€1.520,00
6 hs.Adjustments and connection powersupplies
€95,00€570,00
6 hs.Adjustments and connection supply hotwater coil
€95,00€570,00
8Support Blaich Automation (Daniel Kuttruff) on site with cables and hardware
€95,00€760,00
1MATERIALS
€0,00€0,00
25,6 KGDisposal refrigant 410A
€17,25€441,60
12 pcMountings
€69,00€828,00
14 mSteel support beams
€80,50€1.127,00
6 pcTower Crane
€517,50€3.105,00
2 pcDuctwork RTU1 & RTU2
€1.265,00€2.530,00
2 pcIsolation of ductwork and Stucco plate finishing
€1.725,00€3.450,00
2 pcElectrical cabels ans materials
€201,25€402,50
2 pcPiping hotwater supply, appendages
€115,00€230,00
2 pcIsolation of hotwater piping and Stucco plate finishing
€230,00€460,00
1 pcSmall materials
€175,50€175,50
1RTU
€0,00€0,00
1 pcDAIKIN, model UATYQ75AFC3Y1

- Size (mm) 1800x3750x2240; weight (kg): 1553
- REMOTE CONTROL UATYQWRC
- FREE COOLIN DUMPER
- HEAT THERMODYNAMIC RECOVERY

€34.858,45€34.858,45
1pcDAIKIN, model UATYQ30AFC3Y1

- Size (mm) 2150x1790x1730; weight (kg): 780
- REMOTE CONTROL UATYQWRC
- FREE COOLIN DUMPER
- HEAT THERMODYNAMIC RECOVERY

€18.250,50€18.250,50
Subtotal€74.028,55
IVA€0,00
Total€74.028,55